Skip to product information
1 of 3

Cemcrete Cement-Based Swimming Pool Coating (For Marbelite Pools) – 15kg

Cemcrete Cement-Based Swimming Pool Coating (For Marbelite Pools) – 15kg

Color
Regular price R 1,749.00
Regular price Sale price R 1,749.00
Sale Sold out
Shipping calculated at checkout.

Estimated Delivery Time (click here)

Cape Town, Durban, Gauteng: 10 Days | Other areas: 12 Days | Sorry, no delivery to outlying areas and farms.

Give your worn marbelite pool a fresh, smooth finish without the cost of full re-plastering. Cemcrete Cement-Based Pool Coating is a high-bond, cementitious coating designed to revitalise old, pitted or stained plaster surfaces and extend the life of your pool. Easy to apply with a brush or roller, this 15kg twin-pack delivers a durable, chemical-resistant finish that becomes an integral part of the existing plaster.

Perfect for DIY pool renovations or professional use, this coating offers a cost-effective way to restore the look and usability of older swimming pools.


Why Choose Cemcrete Pool Coating?

  • Cost-effective alternative to re-plastering
  • Easy brush or roller application
  • Smooth, refreshed finish for old plaster
  • Excellent bond strength and durability
  • Strong abrasion and chemical resistance
  • Becomes part of the existing pool plaster
  • Ideal for DIY pool refurbishment projects

Ideal For

  • Revitalising old, acid-washed marbelite or cement pool plaster
  • Pools with pitted, stained or worn surfaces
  • DIY pool renovation projects
  • Homeowners wanting a fresh look without full resurfacing

Not suitable for:
Oil paint, plastic paint, fibreglass pools, new cement surfaces, or new pool plaster.


Coverage

  • 1 × 15kg twin-pack covers ±25m² (two coats)
  • Average 4.5m × 9m pool requires ±3 drums

Application Overview

Project time: ±2 days

  • Day 1: Surface preparation
  • Day 2: Apply coating (two coats same day)

Application method:

  • Apply to a damp (not wet) surface
  • Use a large brush for first coat (horizontal strokes)
  • Apply second coat vertically after ±3 hours drying
  • Roller may be used for second coat
  • Use mixed product within 1 hour

Curing:

  • Air cure for 6 days before filling pool
  • Remove any rainwater immediately during curing
  • Add 1 extra curing day for each rainy day
  • Wait 3 weeks before using an automatic cleaner

Surface Preparation (Critical for Best Results)

  • Grind/sand entire pool surface
  • Pressure wash and remove all debris
  • Ensure surface is clean, rough and dust-free
  • Acid-wash old plaster if required
  • Remove algae and contaminants fully

Proper preparation ensures maximum adhesion and long-term performance.


Benefits for Pool Owners

  • Extends the life of existing plaster
  • Restores pool appearance quickly
  • Saves thousands vs full re-plaster
  • Achieves a clean, modern finish
  • Suitable for DIY or professional application

Storage

Store unopened packs in a dry, covered area for up to 6 months. Protect from moisture and freezing conditions.


Important Notes

  • This is a once-off coating system.
  • If the surface deteriorates significantly in future, re-plastering will eventually be required.
  • Do not apply if rain is expected within 4 hours.
  • In hot weather, apply early morning or late afternoon.

What’s in the Box

  • 15kg twin-pack (powder + liquid component)

Restore Your Pool Without Re-Plastering

If your marbelite pool looks tired but the structure is sound, this coating delivers a practical, budget-friendly upgrade. With proper preparation and curing, you’ll get a clean, durable finish that brings your pool back to life.

Order now and give your pool a fresh start.



View full details